Install Day 1 Mon. Oct 24th

clean and prep concrete

attach map/drawing to surface

transfer drawing

drawing transferred and ready to tile
This entry was posted on Friday, October 28th, 2011 at 8:43 am and is filed under Uncategorized. You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.